Friday, October 20, 2006

Bathroom fixtures and weekend plans

Well we got our first shipment of bath fixtures. These are for the main downstairs bathroom. We got everything with the antique copper finish. They look absolutely beautiful! I cant wait to install them!

Here's the tub fixture:


Supply lines:


Drain line:


I had wanted to get the tub painted and installed this weekend but the plumbers ran out of time to connect the tub supply shut-offs. I may just do it myself...

They were here today to finish running the new lines to the street.





And to connect the tankless system:



So the plumbing is almost completely done. all that remains is to connect all the fixtures and it can be crossed off the list.

I'll be back at the farmhouse I've mentioned earlier salvaging as much as I can. After this weekend they will be tearing it down. After that I'll be working in the bathroom. I plan to try this plaster patch stuff I found. hopefully it will work well in the main bathroom, then all I'll have to do is skim coat. If anyone has any plaster suggestions or tips and tricks I'm more than happy to hear about it.

Thursday, October 19, 2006

Titan tankless water heater install

We installed our tankless water heater today. We installed it in the laundry room next to the sink. The plumber will be out tomorrow to hook up the supply lines to it.



The N-120 is their largest unit, it's rated for a 2 bathroom house. We have 3 bathrooms but I dont think it will be an issue. 2 will hardly ever be used. Also, all of our plumbing is at the very back of the house so it doesnt have far to travel. If it turns out to not be enough for the house I'll just buy a second one and install it on the other side of the back of the house.

Once it's hooked up and we've had time to test it for at least a few weeks I'll post all my thoughts on it.

Kitchen walls revisited

Wall before:


Wall after 5 hours of work:



I hate days like this...

Wednesday, October 18, 2006

Bathroom beadboard walls update.

Quick update on the beadboard walls as I dont have much time to post. I'll post a lot more on this later.

I finished up the trim on the beadboard, then sanded and stained everything. I'm still not sure if I should stain it a second time or not. I'll be putting at leat 2 coats of satin poly on it. It didnt come out exactly right in the pictures, it looks like it has a purple tint to it in the pics but it doesnt.

Here I am in the process of rubbing the stain on:


This pic gives you a good idea of how much darker it is with the stain:


Here are a few after pictures:




Maybe once I apply the poly it will look better in the pictures than it does now.

Tuesday, October 17, 2006

The Main bathroom walls

Well I guess it's time that I post about the walls in the main downstairs bathroom. I had wanted to finish them before I posted about them but I've had a lot of delays recently.

Here's a before shot of the bathroom:

Lovely, isn't it?

Here is where I'm at right now:


I still need to finish up some of the trim and pick a color to stain it. the dark colored wood is old heartpine that I've salvaged from this house as well as the old farmhouse I mentioned in a previous post. I'm trying to use as much reclaimed wood as possible. The light colored wood is decorative grade beadboard and trim. I'm wanting to stain it all a dark color. Once I patch the plaster the walls above the beadboard will be a dark forest green or a dark burgundy. The clawfoot tub will be the same color.

We're looking for a nice high-tank toilet now. We had found one in a house that was going to be torn down (it was a really nice old one) but they've decided to not tear down the house now so we cant get it. So we're going to have to buy a new one.

The dresser on the left is going to be the vanity. I got it free from someone who had it sitting in their workshop for years collecting dust. The top piece (not visible in the above picture) we found in an old antique store in Alabama.

Here is a beter picture of the vanity:


I still need to refinish it. I'm also thinking of turning the 2 bottom drawers into double swing-out beadboard doors (from salvaged beadboard of course). The top 2 drawers will be shortened to accommodate the plumbing. We just bought all the fixtures for the room also. We are going with all antique copper fixtures from Signature Hardware.

I just realized that the sink I ordered from Signature Hardware is back ordered until January. I canceled the order and I'm looking at other options now. I think I'm going to go with this one:

This one is nice also:



Here is the Faucet we've ordered:


I'm hoping to finish the trim and start staining tonight. If I do I'll post some pictures of the progress tomorrow.

Thursday, October 12, 2006

Installing the kitchen walls

I wanted to post about the beadboard walls in the bathroom but I'd rather wait until it's completed. I had hoped to get it finished off last night but I still have a little bit of trim to finish off and then I have to stain it. I havent decided which stain I'm going to use on it yet either. I want it to be really rich looking. I was thinking Red Mahogany. If anyone has any suggestions on what stain to use that would go with the floors in the previous post I'd love to hear from you.


Ok, on to the kitchen walls. Two of the walls were in really bad shape, the plaster was cracked and falling off so I removed all the plaster from them, One wall needs a lot of touching up of the plaster and the last plaster wall is in decent shape.

We decided to use reclaimed T&G 4" pine boards for the walls that the plaster had been removed from. The wood came off the walls of an early 1900's farmhouse that was being demolished.


This is the before shot of one of the walls:


Here is how far I've gotten:


It's coming along nicely. Like the colors? :) The outlet high up on the wall is for the microwave, it will be installed above the stove.

I'm hoping to get back in here and finish the walls sometime next week. I'll be out of town again this weekend so I wont get any work done, then I have to finish off the main bathroom so we can finally get our tub in there. I'm tired of making the trek to my moms house just to take showers...

Monday, October 09, 2006

Downstairs bathroom floors -9-15-06

When we got the house the main downstairs bathroom floor looked pretty good. We thought it would just need to be refinished. Half of the floor was covered by linoleum. I pulled the linoleum up and found this:


Damn. It's a wonder the tub and toilet didnt go crashing into the crawlspace...

I pulled up the floor (being very careful to salvage what boards I could) and discovered another floor underneath it:



It's nice wide-plank heartpine but unfortunately it's in really bad shape.

I went ahead and pulled it up also and found this:



All three of the joists are rotted, not only that but they are notch-cut so they are splitting too. I decided to remove them instead of sistering them because I'm not a big fan of notch-cutting floor joists.

I pulled them out and replaced them with pressure-treated 2x8's and metal joist hangers.


As you can see the plumbers have replaced all the old cast iron pluming with new PVC / CPVC.

Next I laid a sub-floor of 3/8 plywood. I should have gone with 5/8 in hindsight but it's too late now:


I made sure to mark off where the joists are so it's easier to nail the new flooring in.

Then it was time for the new flooring. We have a bunch of 5 1/8" Southern yellow pine T&G flooring that we got for $1.50 sq/ft. Cant beat that price though I really wanted heart pine.

I laid the new flooring in, this was my first time ever laying flooring and I think it came out great considering. The first board took forever to get just right but the rest went pretty quickly.




I called the floor guys in to finish the floor so we could get a working bathroom in the house ASAP. It's no fun having to run up to Burger King every time nature calls...

They came out and showed me a bunch of samples but none looked just right. Most of the rest of the house is heart pine, I wanted something that either would match that or compliment it. The morning they came out to stain I ran to home depot and found Red Chestnut stain by Minwax. I bought it and came home to try it out on a scrap piece of flooring. It looked pretty good so I told them to use that.

Here are the results:



I'm amazed at how much it looks like heart pine! the floor guys were really amazed too. the floor looks really glossy in the pics because it was still wet. We decided to go with a satin finish to keep with the period.

Well that's it for the floors. Next was to install the beadboard. I'll post that next.

Kitchen wiring and insulation - 9-9-06

I've rewired the entire kitchen since the walls are down. I'm also adding 2 RG-6 coaxle jacks and an RJ-45 network jack. The network jack and one of the cable jacks are in the breakfast nook, the other cable jack is next to the counter to the right of the sink. I've installed a media panel for all the media connections. It's in the closet in the study. I'll post more on that later.



Kitchen Appliances

The look we're going for in our kitchen is sort of a primitave farmhouse look. We're going to be reusing the cabinets that were in the old kitchen, they are good solid plywood cabinets. I'll be building beadboard doors for them though. 2 walls will be plaster and the other 2 will be T&G wood.

For the appliances we decided to go with stainless, everything is Frigidaire with the exception of the dishwasher, it's a Kitchenaid. I know stainless is not primative but I've gotta have nice appliances.

Sorry about the terrible picture quality...







The fence - 8-19-06

I'm installing a 6' privacy fence all the way around the back yard. It's roughly 463' of fencing. The neighbors to the left of us had been using our driveway as a drivethrough, I got tired of seeing cars pulling through my driveway at all hours of the day and night so I decided to make the fence a priority.

To date I've only gotten the first 6 sections of fence up but it was enough to blcok their path through my driveway. The problem is the soil, Georgia clay is some hard ass stuff. I dug the 6 post holes by hand, 2' deep, and had some serious blisters. I'm going to rent a hand auger as soon as I have a free weekend.

The back of the back yard is a jungle, I had to hack a trail all the way around the yard for the fence.


Here's a sample of what I had to hack through.



Here's the fence so far. I'm hoping to finish it either this weekend or next.

We're also going to install a picket fence in the front yard but that will probably be a month or two off.

Thursday, October 05, 2006

The kitchen demo - 8-14-06

At one point someone dropped the ceiling a foot in this room. First I ripped down the drywall, they used cedar 2x4's for the framing. That will come in handy for scrap pieces around the house. Under the dropped ceiling was the original lathe, the plaster was long gone. I tore out all the lathe also. We have some reclaimed 6" and 8" heartpine paneling that we plan on using for the ceiling.


Here's the pine panaling that we'll be using for the ceiling, it's behind the other wood that's in the foreground.





What a mess!


once the ceiling was out it was time for the old bathroom and closet walls to come down:




Well that's all I'm going to post for now or I wont get up in the morning. I'll be updating more either tomorrow or the next day.

Old kitchen demo - outside stairs demo - 8-7-06

The old kitchen for apartment #1 is becoming our breakfast room so everything has to come out. First I took out the stove, washing machine and bottom cabinets:


The cabinets came out next, I dont recomend taking a 12' long cabinet down by yourself. After seeing the flooring under that carpeting I'm surprised it didnt go right through it...

The 2 doors that were behind the cabinets had been closed off since 1955, it was pretty cool to be the first to open them since then. They still have the original stain on them too, awesome!


The door on the left goes to the laundry room, the one on the right goes to the bathroom.

I want to stop and appologize right now if it seems like I'm rushing these posts... because I am. I have 2 months of work to catch up on! If I dont hurry I'll never get them caught up...

Ok, the next project that needed my attention was the hideous outside stairs. They had to go. they were installed for the upstairs apartment.




The little addition in the background coming off the side of the house is going to be our breakfast nook.



I was reading the DevilQueen blog the other day when I saw a picture of John's shin with a big bruise on it. I just had to laugh (not at him of course) when I saw it because it reminded me of my little "mishap" while demoing the stairs. If you're real squemish you may not want to scroll down to see it...








This is what happens when you miss what you're aiming at with a framing hammer. Actually it didnt hurt near as bad as is looks...