Friday, August 24, 2007

A nice surprise

The living room has finally been cleared out and I have begun the task of scraping the walls.


Once the walls are scraped I need to run some romex for the chandelier and light switch. Then I can begin patching all the cracks.

The wood shed is pretty full now. I need to make a few shelves so I can stack all my wood so I can fit more in there.


Now that all the large pieces are in I need to put the last wall up.

I made a very nice discovery while scraping yesterday. I decided to scrape some of the paint off the mantle, I was expecting pine but what I found is so much better.


That's Tiger Oak! The entire mantle is tiger oak veneer. Somewhere along the way some genius decided to put nails in the top part of the veneer on the face. I should be able to repair that though. I just dont understand how someone could have just painted over these mantles.


The mantle is Empire style. The ones in the Parlor and formal dining room are also Empire style but they have the more common curves on the legs of the mantle. I decided to check those to see what was under the paint:

Formal Dining Room

Parlor

Both are also Tiger Oak! The mantle in the parlor appears to be solid tiger oak, not veneer like the others. They should look great once they are refinished.

Wednesday, August 22, 2007

Living room cleanup

I've been working on clearing out the storage room... sorry... the living room since Sunday and I'm still not finished. It is almost completed though so it will be done by tonight. Then I can start scraping, patching, and rewiring.

Here is a picture of the room after almost a full day of working on it:


I really wish I had gotten a picture of the room before I started, you literally couldn't walk into the room it was so full. The above shot was taken after I had filled two full sized rolling trash cans, two full sized rolling recycle cans, removed almost all my tools, sorted into boxes all kinds of miscellaneous parts like electrical, plumbing, screws, nails, and bolts, and removed 2 large piles of left over flooring.

This next picture was as of monday:

I had to de-nail all the wood I removed so that I could stack it cleanly in the wood shed. This took a lot of time. I'm also having to cut up all the scrap wood so it will fit into contractor bags. I'm having to throw everything out with the regular trash since I cant afford another dumpster.

Here is the room as of last night, as you can see it shouldn't take long to finish emptying it.


I really hope that I can get this room painted by the weekend, all that purple is starting to hurt my eyes!

Monday, August 20, 2007

Pole Shed part 3 and the living room

The pole shed is about done except for the last wall panel, trim, and paint. I'm thinking barn red. I'm waiting until I finish putting all the large pieces in the shed before I put up the last panel.




The living room and the main guest room have been our storage areas for almost as long as we've been in the house. We are finally getting these two rooms cleared out and moving everything into the shed. So far I've moved about 22 doors and 20 sets of windows into the shed along with a lot of wood.

As soon as the living room is completely empty I'll begin on the scraping and patching of the walls and ceiling. They're in decent shape so I expect to have the room painted before the weekend. I'll post some pics of the room in the next post.