Setting this scaffolding up by myself is a pain but I've worked out a bit of a system and can set it up in about 15 minutes and less than 10 to take it down. The hardest part is carrying the sections up the scaffolding during setup.
Here are a few pictures from the last two days:
I'm doing pretty good on paint, I've used less than a gallon on trim and about 2.5 gallons on the green so far. This is with the front completed, the right side almost completed and the back 1/2 completed. That's about 2/3's done. This exterior grade Valspar covers very well without using a lot.