Showing posts with label paint. Show all posts
Showing posts with label paint. Show all posts

Tuesday, February 10, 2009

House Painting

The weather was so nice outside yesterday that I decided to go out and work on finishing up the house painting. You may remember that I began painting the house back in May.

I got the right front side done and most of the left side.



I still have to finish the Porch, the back 2nd floor of the house, the left side kitchen, and the right side laundry room.

Monday, November 10, 2008

2nd floor porch, new front door.

Work has been progressing slowly but I have gotten some work done. I finally finished rebuilding the second floor porch. There were two very small areas that were leaking but they were letting a ton of water in. This has caused some of the beadboard on the first floor porch ceiling to come off. Great, another project.



While I was fixing the leaks I made a design change that had been bothering me ever since I first built it. In the picture below notice the 2x4's running left to right, they are what the decking attaches to:


Notice anything wrong with this setup? There's nowhere for the water to drain! It will get between the floor boards then be trapped behind the 2x4's. I don't know what I was thinking when I did this. It's a really stupid mistake. This wasn't what caused the leak but water would have pooled and eventually caused rot.

The way I fixed this was to pull up the 2x4's, take some 6' fence panels and rip them in half lengthwise to make 8 6'x3"x3/4" pieces, then lay them front to back. Then I placed the 2x4's on top of them. Now the water can drain. Sorry I didn't get a picture of it but I think I described it clearly.

Anyways, while I had the 2x4's up I took the time to add another layer of some heavy duty roof cement to the sub floor. I also used a ton of roofing caulk wherever I thought it might be a possible leak area. We got a good bit of rain the next day after I did this and no leaks!

I went ahead and primered and painted the railings before I reinstalled them since it's much easier that way. Here's a few shots of the completed second floor porch:




I went out on the porch roof this morning to get these next two pictures without realizing that there was ice on the roof! Of course I didn't slip until I was about 8 steps out and turning around to take the pic. That could have been bad...


One of the things I did a few months back that I never got around to posting is the Dining room mantle. This is how it looked when we first got the place:

This is as far as I got on it last Winter:

I finished scraping the paint off of it then sanded it 3 times with progressively smoother sandpaper. Here it is after the final sanding:

Then I applied 2 coats of amber shellac:


I still have to scrape the paint off the tiles, repair the hearth tiles, and put up oak trim around the hearth (the original was removed for the 70's shag carpet).

We found a beautiful door at a flea market out in Alabama last month. We picked it up for $50! It's a wonderful Victorian door with a purplish glass inset. In the pic below I'm test fitting it into place. I had to trim about 1" off the bottom:

The mortise for the lock was on the wrong side, I would have just hung the door the opposite way but I've already installed all the light switches on the left side of the door. The outside of the door is different so I couldn't just flop the door around. So I had to make a new mortise on the other side of the door and fill in the old one. I took heavy paper towels and packed them in the mortise as hard as I could then used wood putty to fill in the rest.

Cutting out the new mortise by hand was a real pain in the ass! I used a drill bit of the same diameter as the mortise lock and a chisel. Old school... I also had to cut out the area for the hinges and fill in the area where the hinges were.

There were also a lot of small holes where things had been nailed into the door over the years and even a 9" long chunk of the edge that had come off. Also someone had gouged a rough hole in the door for an old doorbell at one point. All this had to be repaired. Once it was repaired I installed the hardware, I used the door hardware off my old door. Here is a shot of the test fit after all this was done:

Then I put on a coat of amber shellac and a coat of satin poly:



I think the wood putty is a bit too noticeable where the old door knob and door bell had been. I may strip those areas, stain the wood putty to match the rest of the door then re-shellac and poly it.

Saturday, September 13, 2008

Laundry room complete

We finished up the Laundry room the other day. Here's an old before shot:
Here are the finished shots:




I'll be replacing this back door with one similar to the Breakfast room back door.

I still need to paint the door on the left.


We painted the floor black, we'll see how well it holds up over time.

Thursday, September 04, 2008

Breakfast Room repaint

We've repainted the Breakfast Room. The yellow color we used just wasn't doing it for us. We ended up going with the same color we will be using in the Master Bedroom at the Woodbury House. Here are some pictures of the room:






You may remember that the 2 doors on either side of the wood burning stove had it's original finish on them when I first uncovered them (They were boarded over and then had cabinets hung over them some time in the 40's or 50's).


Instead of just painting over it I reversed both doors. This ended up working out much better for the layout of the Laundry room and the Bathroom anyways.

We FINALLY have a room that is almost completely finished. The only things left to do are a few trim pieces, outlet and light switch coverplates, and refinish the floor.

Friday, August 15, 2008

Porch roof complete

I've finally finished the porch roof project:




I'll paint the railings in my next project, which is to finish painting the house.

Tuesday, August 12, 2008

Building the second floor deck

I didnt get as much done over the weekend as I'd hoped but progress was still made. Saturday morning I got back to work. First I installed flashing in the deck area:
Once that was secure I installed the beaded wood siding to the porch roof. I still need to add some flashing to the top, I'll cover it with trim:

Next I sealed the tin floor with an aluminum and tar mix that I found in the roofing section of Lowes:

And then installed the 1x6 decking:

The next day I got to work on designing a railing. I had a newel post from the stairs of the old Anderson house, plus the cap to a second newel post. I was able to dig up enough wood and matching trim to build a second post just like the first:


The one on the right is the original, the one on the left is the one I built.

I sanded and primered them and installed them on the deck. I also installed the railing. I have about a dozen spindles left over from the railing I built for the first floor but it wont be enough, I'll have to get some more.




Wednesday, June 04, 2008

Punch list work

I know I never made a follow-up post on the exterior house painting but it will have to wait a while longer. I completed what I had to get done with the scaffolding so I could return it but that was it. I still have a lot of the back of the house to complete as well as about 3 feet of the bottom on both sides.

The reason I didnt finish is because we wanted to get our new (old) Airstream in usable condition so we could go on a small vacation. Now that we're back it's time to get this house finished already.

I had intended on coming back and removing the second story porch roof and then finish up the painting but I've decided to hold off on that for a few weeks until I have some help. It will go much faster that way. So in the mean time I decided to create a punch list of little things around the house that need to get done and have begun working on that.


I've been concentrating on the front of the house the past few days, mainly the foyer and the study. I finished staining the beadboard in the study but dont have any good pictures yet. I should be putting a coat of poly on it this afternoon.

I have begun work on the mantle in the study also. Most of the mantle is brick but it has a pine top piece. I stripped the 20 layers of paint off of it yesterday:


I will be shellacing it this afternoon. I've decided to find a brick red paint color and paint the brick for a few reasons. One, the paint is very hard to remove but also the brick underneath it is cement so it's gray, not red. I may try to paint the mortar lines gray then paint the brick red and then sponge it to make it look more realistic.

I've also been trying to finish the trim in the foyer. You may remember that the wall between the foyer and study was not original and was crooked so I tore it down and rebuilt it straight, giving the foyer an extra foot.

The old wall covered the edge of the front door frame so I used some of my salvaged trim to replace the missing pieces. This trim came from the upstairs bathroom and is the original trim design for the house so it matches the rest of the foyer:


I know I should have painted it first but I like to do stuff backwards. Besides, the door frame needed a touch-up coat of paint anyways.

By the way, the plywood is over the front door because the glass broke in the door. I'm sure replacing it is going to be costly.

Next I installed the picture rail on the new wall:


I've also installed the upper trim on the baseboards but still have to install the 1/4 round at the bottom of the baseboards. Once I do that and install the trim on the study doorway and paint everything the foyer will be completely done... well except for the broken glass in the front door that is.

Tuesday, May 06, 2008

More house painting

Things have been moving a little slower that expected. I've almost gotten the rght side of the house done. I have maybe 1 hour left on that side before I can move to the driveway side of the house. I should only have to do two setups of the scaffolding on that side.

Setting this scaffolding up by myself is a pain but I've worked out a bit of a system and can set it up in about 15 minutes and less than 10 to take it down. The hardest part is carrying the sections up the scaffolding during setup.

Here are a few pictures from the last two days:






I'm doing pretty good on paint, I've used less than a gallon on trim and about 2.5 gallons on the green so far. This is with the front completed, the right side almost completed and the back 1/2 completed. That's about 2/3's done. This exterior grade Valspar covers very well without using a lot.