This has been my work and storage room for a while now. This room needs moderate work. There is a LOT of grease on the upper walls (the guest bathroom adjoining the room was a kitchen during the houses apartment life). there is heavy stipling on the ceiling that will have to be sanded off. There are some cracks and chipped paint on the walls that will have to be patched. The mantle needs to be replaced with one of our spares as it's nothing more than a few 2x4's and thin plywood (no idea what happened to the original). then of course I have to sand, primer, and paint.
This room is in a lot better shape. The ceiling was replaced with drywall at one point, it's in good shape except for the poor mud job done to it. I'm going to skim just the joints. The walls are in relatively good shape, not much chipped paint or cracks in here. The only other thing to do in here besides the ceiling is a light sanding of the walls then primer & paint.
The guest bathroom needs a lot of work, starting with the floors. the floors are sloped so I'm going to have to take them up. From prior experience in the other 2 bathrooms the floor boards wont survive this, they are just too brittle. So a new floor needs to go down. I need to tear out the plaster on the bottom half of the walls and install beadboard. The rest of the walls have to be patched. I need to install a GFCI outlet near where the vanity will be and rewire the lighting. The ceiling is in rough shape. I really want to take it out anyways because I want to raise it up a foot. If I do this I'll have to decide what I'm going to replace it with, T&G wood or greenboard, not sure yet. Then of course I have to sand, primer, and paint.
The master bathroom needs moderate work. I've actually already removed the plaster from the bottom half of the walls and installed the plywood base for the beadboard but I didn't have a picture of the room from after that. So, in here I need to re-frame the ceiling since I'm raising it up a foot in here just like in the guest bathroom. I've already removed the beadboard from the ceiling because some genius decided to stiple it at one point. I'm going to try to clean it up and reinstall it. If it doesn't clean up I still have a lot of regular 4' T&G wood left over that I can use for the ceiling. In here I also need to install a GFCI outlet near where the vanity will be and rewire the lighting. I need to patch the walls, hang the beadboard on the walls, then sand, primer, and paint.
In both bathrooms I still have to sand and paint both tubs and install all the plumbing fixtures. Plus I still have to build the vanity for the master bathroom. All that will be done after the floors are refinished though. So those are my options, still not sure where I'll start. I guess I'll find out when I go upstairs and just see where I end up.