Sunday, September 02, 2007

Living room complete!

The living room is finally done, well not done but done enough. We primered and painted the other day.

Primer

After primering, I painted all the trim then did all the cut work for the walls:


Then I painted the walls:




We then spent the better part of the day getting the room organized:







Obviously, there is still a lot left to do. The TV in the corner is temporary until we get our flat panel, it will go above the mantle. The corner that the TV is in now will have a wingback chair and side table.

Tuesday, August 28, 2007

Living room wall patching and new porch look.

Yesterday afternoon was spent patching the living room walls. The first thing I had to do was fix all the holes I made when running the wire for the lights.

I took some scrap lathing and cut it into short strips and placed it in the hole using my nailgun to secure it to the lathing around the hole.


Then I cut 1/2" drywall to fit in the hole and screwed it in place.

Here are all the holes covered and ready for mud.

And here they are mudded.

After the holes were patched I patched all the cracks in the rest of the room. As I've mentioned before I'm using drywall mud mixed with play sand. It gives it a texture very similar to plaster and blends in well with the existing plaster.


Unfortunately today I have other things I have to take care of so I doubt I'll get a chance to sand and primer today.

I've come up with a redesign of the front porch, originally it was just a one story porch but at some point a second story porch was added. The second story porch is horribly done with just 4x4 posts, 2x4 joists, and plywood floors. I had thought of removing the second story porch but we really love sitting up there in the evenings.

So I took a picture of the house, played around with a few ideas and came up with this:


I think it keeps with the style of the house nicely and gives us our second story porch to sit on in the evenings. This style of porch was actually popular in this area so it keeps with the period look.

I probably wont get to this project this year, it will have to be something I take on after the rest of the house is finished.

Monday, August 27, 2007

Living room mantle and electrical

Work on the living room has gone slower than anticipated... imagine that. Stripping the mantle took almost the entire day Saturday.


unfortunately the tiger oak veneer on the front edge of the mantle was in such bad shape that I had to remove it. The wood underneath is oak but it's very rough and it's not quarter-sawn so I'll probably have to get some new oak veneer.

Sunday was almost entirely taken up with rewiring the lighting. The original knob and tube was shoved back up into the ceiling at some point and metal conduit run along the ceiling and down the wall.


The light switch wasn't even by the door to the hallway. When the house was apartments the little door in the above picture was the entrance to this room, it is a small closet that connects to the study. These two rooms, along with the main bathroom and the laundry room were one apartment.

So anyways, the conduit had to go. Running the new wire from the fixture in the ceiling and down the wall was a pain. I had to cut a lot of holes in the wall to run it.


The rest of the day sunday was spent finishing up all the scraping of the walls and ceiling.



Hopefully I can patch everything today then sand and paint tomorrow. For the trim I've decided to try my hand at faux graining. The living room needs to get done fast and I dont have time to remove all of the paint from the trim.

Friday, August 24, 2007

A nice surprise

The living room has finally been cleared out and I have begun the task of scraping the walls.


Once the walls are scraped I need to run some romex for the chandelier and light switch. Then I can begin patching all the cracks.

The wood shed is pretty full now. I need to make a few shelves so I can stack all my wood so I can fit more in there.


Now that all the large pieces are in I need to put the last wall up.

I made a very nice discovery while scraping yesterday. I decided to scrape some of the paint off the mantle, I was expecting pine but what I found is so much better.


That's Tiger Oak! The entire mantle is tiger oak veneer. Somewhere along the way some genius decided to put nails in the top part of the veneer on the face. I should be able to repair that though. I just dont understand how someone could have just painted over these mantles.


The mantle is Empire style. The ones in the Parlor and formal dining room are also Empire style but they have the more common curves on the legs of the mantle. I decided to check those to see what was under the paint:

Formal Dining Room

Parlor

Both are also Tiger Oak! The mantle in the parlor appears to be solid tiger oak, not veneer like the others. They should look great once they are refinished.

Wednesday, August 22, 2007

Living room cleanup

I've been working on clearing out the storage room... sorry... the living room since Sunday and I'm still not finished. It is almost completed though so it will be done by tonight. Then I can start scraping, patching, and rewiring.

Here is a picture of the room after almost a full day of working on it:


I really wish I had gotten a picture of the room before I started, you literally couldn't walk into the room it was so full. The above shot was taken after I had filled two full sized rolling trash cans, two full sized rolling recycle cans, removed almost all my tools, sorted into boxes all kinds of miscellaneous parts like electrical, plumbing, screws, nails, and bolts, and removed 2 large piles of left over flooring.

This next picture was as of monday:

I had to de-nail all the wood I removed so that I could stack it cleanly in the wood shed. This took a lot of time. I'm also having to cut up all the scrap wood so it will fit into contractor bags. I'm having to throw everything out with the regular trash since I cant afford another dumpster.

Here is the room as of last night, as you can see it shouldn't take long to finish emptying it.


I really hope that I can get this room painted by the weekend, all that purple is starting to hurt my eyes!

Monday, August 20, 2007

Pole Shed part 3 and the living room

The pole shed is about done except for the last wall panel, trim, and paint. I'm thinking barn red. I'm waiting until I finish putting all the large pieces in the shed before I put up the last panel.




The living room and the main guest room have been our storage areas for almost as long as we've been in the house. We are finally getting these two rooms cleared out and moving everything into the shed. So far I've moved about 22 doors and 20 sets of windows into the shed along with a lot of wood.

As soon as the living room is completely empty I'll begin on the scraping and patching of the walls and ceiling. They're in decent shape so I expect to have the room painted before the weekend. I'll post some pics of the room in the next post.

Wednesday, August 15, 2007

More on the pole shed

Yesterday I started building the walls for the pole shed. The shed will have two windows and one or possibly two doors. One door will be a 3' door at the end of the shed for bringing large objects in. The other door will be on the side if I decide to install it.

The walls are vertically grooved plywood supported by pressure treated 2x4's. The windows are salvaged upper panes. I'm installing them on their side with hinges so they will swing out. The floor will be pallets for now but I may install plywood down the road.




Tuesday, August 14, 2007

Pole Shed

I've spent the last few days building a pole barn. I have a lot of salvaged wood, windows, and doors sitting in the living room and first guest bedroom. I need to get these rooms cleared out so I can begin working on them. The pole barn will house all of my salvaged material.

I found a level spot in the back yard for it and cleared it out. The barn will be 8x12 in size so I guess it's more of a pole shed than a barn. The inside ceiling height will be close to 9'.

I began by laying out the footprint with string tied to stakes. I made sure it was square by using a drywall square and a 4' level then checked it with the 3-4-5 string method. To do this you make a mark on one of the strings 3' from the corner, and 4' down on the other string then you measure between both marks. The measurement has to be exactly 5' for the corner to be square.

With that done I marked out the locations of the posts and began digging the holes.


I dont know about you but digging post holes by hand in 102 degree weather is not fun.

after all the holes were dug I cemented the poles in place making sure each was perfectly level on both sides.


The next step was to install the headers. These are what the roof trusses will sit on.


After installing the headers I began building the roof trusses. These were fairly simple to build. I used spiked metal mending plates on each side to hold the trusses together. I then installed the trusses on the header roughly 2' on center using hurricane straps.

Next I installed the purlins across the roof trusses. these tie the trusses together and gives you something to screw the tin to.


Next came the tin for the roof. The tin is galvanized, I'll probably paint it green or red. I screwed it to the purlins with steel screws with neoprene washers so it wont leak.



Left to do is the ridge cap for the roof, the face boards on the truss ends, a few windows, a door, and the walls. I'll be using the windows and doors that I have on hand. The plywood for the walls is going to be the most expensive part, costing from $150 to $250. I guess I should mention that I've only spent less than $200 so far.

Tuesday, August 07, 2007

side yard steps

I havent done much of anything on the house in the last few weeks. There have been too many other things that have taken my time. I'm hoping to be able to get back to work on the house in the next few days.

The only work accomplished is the steps in the side yard.


These were originally supposed to be brick but I ended up building these in the meantime. I'll be building the gate and installing it hopefully today.

Tuesday, July 24, 2007

Study bookcase finished

I have not completed near as much on the house as I had hoped in the last few weeks. Most of the delay being from a hospital stay and a week of forced recuperation time. I have managed to accomplish a few things however.

I finished the built in book cases in the Study last week. I might add one more coat of amber shellac though.




It's very hard to get a good clear shot of the entire bookcase and to also get the lighting adjusted properly to show the true color of the bookcase. These images will have to do though. The one thing left to do on them is build the doors for the bottom shelf on either side.

I've been working on the master bathroom but I dont have any pictures of that yet. So far we've sanded and painted the clawfoot tub, painted the walls, and I've begun installing the beadboard wainscoting on the walls. Once the beadboard is done I need to paint it then finish building the double sink vanity. Hopefully I'll have some pictures of it soon.

Thursday, July 12, 2007

Dr. Darnall

I'm still doing research on the history of the house as time permits. Dr. Thomas M. Darnall was the first owner of the property, having moved his family here from Atlanta in 1852. As I've found out he was very respected throughout the community. Here are a few articles about his death on 8Jan1885 in the Griffin Daily News:

This first one was published just before he died.

In this one you can see that the Mayor shut the city down during his funeral and also that he was a Mason.


This article was written 2 days after his death. It gives a lot of information about his history and about how well he was respected.

This last article was written in the Macon Telegraph. Macon is about an hour south of Griffin.

I would really love to find a picture of him and his family and especially of the house. I'm still trying to track down his relatives. His family moved back to Atlanta in 1899 and that's where their trail ends.