I still have a few small pieces of drywall to hang then I'm going to skim-coat the entire thing with mud mixed with sand. I'm hoping to finish this up some time next week.
We were trying to finish as many bedrooms as possible because we had guests staying over for the holidays. The only one we managed to finish was the master bedroom. We had to scrape, sand, patch the walls, and sand again.
We then primed the walls and ceiling.
Then painted the walls.
We were a bit nervous about the paint color at first, turns out that it just needed a second coat to smooth it out. I didn't realize that the dark colors we've chosen required a dark primer so the white primer was changing the color a bit. Once we put the second coat on it looked like we wanted it to.
I say we finished the room but we really haven't. There's still a lot left to do. We need to paint the trim the closet and the mantle, redo the electrical, and the floors still need to be refinished. Once the entire second floor is finished we'll be getting the floor guys in here to refinish them.
I finally took out the built-in cabinet that was in the Study. As I suspected it is not original to the house. It's built out of T&G white oak, the lumber yard's name is stamped on the back of each piece. From researching it online it appears the lumber yard dates to the '30's. This reinforces my belief that the house underwent a major renovation in the '30's where a lot of the original detailing of the house was removed.
I still haven't figured out what to do with the space. I was thinking of building some type of secret compartment or possibly making it into an alcove similar to what's on the other side of the wall in the Living Room. The new wall dividing the Study from the Foyer will be right where the return register is in the picture above, this will cut down on the space available to work with.
Next on my list was the dining room ceiling. It was sagging about 3" and in serious danger of falling. We're going to put a tin ceiling up in the next few weeks. We were using the Dining Room as our bedroom so we had to move it into the Study.
Pulling the old ceiling down was a hard, dirty, nasty job. There was 5/8" drywall put up over the original plaster. Our construction dumpster is on the opposite end of the house so I had to remove the debris one dustpan full at a time, carrying it through the center hall and living room to throw it out the window into the dumpster which is actually about 12' away from the window.
Once the ceiling was down and the mess cleaned up (2 days later) we began painting. We're using only Historic Trust approved colors from American Traditions throughout the house. Here's the finished product, we're really happy with how it turned out:
Of course we still have a long way to go in here as well. We have to stencil above the picture rail, hang the tin ceiling, strip all the trim and shellac it(including the mantle and doors), and refinish the floors.
Next we painted the Parlor.
That last shot gives a great view from the Parlor to the Dining Room and back to the Kitchen. In here we still have to wallpaper above the picture rail, strip and shellac all the trim, and refinish the floors.