Last week I painted the Study walls, I took down all the picture rails and started stripping them but there are so many layers of paint and so many little grooves that I gave up after a while. I'll decide later if I'm going to buy new picture rail or finish stripping the old ones.
The next project I worked on was the breakfast room floors, I pulled up the old floors and laid a new subfloor over the winter. I finally got tired of looking at the subfloor so I finished leveling the back half of the sub floor then laid the flooring.

Now I'm scraping and sanding the beadboard walls. Hopefully I'll have that done in a day or two so I can primer and paint.
I also temporarily installed the toilet upstairs in the master bathroom. A few of the gaskets are old and dryrotted so they'll have to be replaced before it can be used.


Last week we built the driveway circle in the backyard. I planted Azaleas in the circle that came from the ones along the front porch. The statue in the center is temporary, it will be replaced with a 3 tier fountain eventually. I still need to add about 40 more bags of top soil before I can plant anything else.